CONCEPT DRAFT 1.0 / 12 STEPS
Access and supported withdrawal
Make the source, access order and support path visible before changing the unit state.
Read procedure ↗STEP-BY-STEP GUIDES
Procedure content for future Genesis simulations. Three twelve-step concept drafts connect the article, learner decision, expected evidence and human review. These guides and the static concept model are distinct from a completed interactive lesson.

CONCEPT TRAINING DRAFTS / NOT APPROVED SOPs
CONCEPT DRAFT 1.0 / 12 STEPS
Make the source, access order and support path visible before changing the unit state.
Read procedure ↗CONCEPT DRAFT 1.0 / 12 STEPS
A near-identical unit is a useful test of source-based judgment, not a fit challenge.
Read procedure ↗CONCEPT DRAFT 1.0 / 12 STEPS
Make each finished state inspectable and let a human decide what the evidence supports.
Read procedure ↗No approved operating SOP has been supplied. These authored drafts concern fictional inert training equipment. They require source/training-owner review before training use and provide no aircraft, OEM, certification or release authority.